Navigation path

Left navigation

Additional tools

Projects selected under 2010 call for proposals – Trans-European Transport Network (TEN-T)

European Commission - MEMO/11/101   21/02/2011

Other available languages: none

MEMO/11/101

Brussels, 21 February 2011

Projects selected under 2010 call for proposals – Trans-European Transport Network (TEN-T)

List of abbreviations

AP = Annual Programme

MAP = Multi-Annual Programme

ATM/FAB = Air Traffic Management/Functional Airspace Blocks

MoS = Motorways of the Sea

PP = Priority Project

RIS = River Information Services

* = project involving more than one Member State; NB not all the funds mentioned are allocated to a single Member State

(€) = recommended TEN-T funding

AUSTRIA

  • TEN-Vorhaben Nr.1 (PP1), Abschnitt Kufstein-Innsbruck; Umbau Terminal Worgl (AP - €5,000,000)

  • Terminal Wien Inzersdorf Planung, (PP 17 - Section: Vienna-Salzburg) (AP - €2,140,000)

  • Greening European transportation infrastructure for electric vehicles* (AP - €4,950,000)

  • Studies on improving the freight corridor concept by using telematic applications for freight, and methods, tools and procedures developed by RNE for rail corridors (AP - €1,211,773)

  • FAB CE implementation of static area of responsibility scenario* (MAP ATM/FAB - €1,447,740)

BELGIUM

  • The Albert Canal: rebuilding the Briegden and Oelegem I bridges (AP - €1,571,532)

  • Greening European transportation infrastructure for electric vehicles* (AP - € 4,950,000)

  • Air Traffic Management Systems - Functional Airspace Block Europe Central (FABEC) (MAP ATM/FAB - €13,781,475)

  • MoS 24 - ICT based co-modality promotion centre for integrating PP24 into Mediterranean MoS* (MAP MoS - €2,452,500)

  • LNG infrastructure of filling stations and deployment in ships* (MAP MoS - €9,569,500)

  • Deployment of Inland AIS transponders in Flanders and The Netherlands* (MAP RIS - €777,000)

  • Implementation of RIS in Flanders II (MAP RIS - €597,120)

CYPRUS

  • MIELE* (MAP MoS - €7,998,250)

CZECH REPUBLIC

  • FAB CE implementation of static area of responsibility scenario* (MAP ATM/FAB - €1,447,740)

DENMARK

  • Greening European transportation infrastructure for electric vehicles* (AP - € 4,950,000)

  • North European Functional Airspace Block (NEFAB) development - preparation for implementation* (MAP ATM/FAB - €4,094,370)

  • LNG infrastructure of filling stations and deployment in ships* (MAP MoS - €9,569,500)

  • Motorway of the Sea Rostock-Gedser* (MAP MoS - €24,494,874)

  • The Baltic Sea hub and spokes project* (MAP MoS - €24,846,900)

  • MonaLisa* (MAP MoS - €11,234,003)

ESTONIA

  • North European Functional Airspace Block (NEFAB) development - preparation for implementation* (MAP ATM/FAB - €4,094,370)

  • The Baltic Sea hub and spokes project* (MAP MoS - €24,846,900)

FINLAND

  • Railway Seinajoki-Oulu (AP - €4,540,000)

  • E18 Helsinki-Vaalimaa studies (AP - €1,250,000)

  • Railway Kokkola-Ylivieska, PPP procurement process (AP - €2,150,000)

  • North European Functional Airspace Block (NEFAB) development - preparation for implementation* (MAP ATM/FAB - €4,094,370)

  • MonaLisa* (MAP MoS - €11,234,003)

FRANCE

  • Design and environmental studies regarding the creation of a multimodal transport system at the Port of Dunkirk (AP - €1,850,000)

  • Etudes pour la mise au gabarit Vb de l'Oise entre Compiegne et Creil (AP - €1,534,331)

  • Adaptation de la ligne existante entre Mulhouse et la frontiere en vue de la circulation de trains a grande vitesse (TGV) ou d'intercity express (ICE) sur l'axe Mulhouse-Mullheim (Fribourg) (AP - €720,000)

  • MoS 24 - ICT based co-modality promotion centre for integrating PP24 into Mediterranean MoS* (MAP MoS - €2,452,500)

  • Services d’information fluviale II (SIF II) (MAP RIS - €1,160,080)

GERMANY

  • Bau der zweiten Moselschleuse Trier (Mosel) (AP - €2,402,220)

  • MIELE* (MAP MoS - €7,998,250)

  • Motorway of the Sea Rostock-Gedser* (MAP MoS - €24,494,874)

GREECE

  • Remaining studies for the section from Arachovitika until the new Patras port of the Athens-Patras railway line (AP - €1,250,000)

  • Completion of the study Ionian Highway (Western axis) from the end of concession to Kakavia (AP - €2,000,000)

  • Monitoring and Operation Services for Motorways of the Sea (MOS4MOS)* (MAP MoS - €2,825,752)

HUNGARY

  • FAB CE implementation of static area of responsibility scenario* (MAP ATM/FAB - €1,447,740)

IRELAND

  • UK-Ireland FAB development of high level sectors* (MAP ATM/FAB - €1,154,378)

  • ITALY

  • MXPT2LINK-UP – Rail link between terminal 1 and 2 at Malpensa Airport (AP - €1,296,490)

  • Progetto del nodo intermodale dell'Aeroporto Internazionale di Catania Fontanarossa (AP - €1,000,000)

  • Adriatic Gateway: the improvement of northern Adriatic ports and the building of a strategic corridor for multimodal transport (AP - €1,000,000)

  • MoS 24 - ICT based co-modality promotion centre for integrating PP24 into Mediterranean MoS* (MAP MoS - €2,452,500)

  • MIELE* (MAP MoS - €7,998,250)

  • Monitoring and Operation Services for Motorways of the Sea (MOS4MOS)* (MAP MoS - €2,825,752)

  • ITS Adriatic multi-port gateway* (MAP MoS - €1,442,500)

  • Studies for the development of the RIS operability along the Northern Italy Waterway System (MAP RIS - €2,930,000)

LATVIA

  • North European Functional Airspace Block (NEFAB) development - preparation for implementation* (MAP ATM/FAB - €4,094,370)

LUXEMBOURG

  • Greening European transportation infrastructure for electric vehicles* (AP - € 4,950,000)

MALTA

  • MoS 24 - ICT based co-modality promotion centre for integrating PP24 into Mediterranean MoS* (MAP MoS - €2,452,500)

THE NETHERLANDS

  • Third Track Zevenaar-German border (AP - €802,500)

  • Extension railway yard Maasvlakte West- Phase 1 (AP - €1,476,600)

  • Implementation study to prepare a Public-Private Partnership to improve maritime access to the TEN-T network at Amsterdam (AP - €1,745,755)

  • Greening European transportation infrastructure for electric vehicles* (AP - € 4,950,000)

  • Deployment of Inland AIS transponders in Flanders and The Netherlands* (MAP RIS - €777,000)

POLAND

  • Studium wykonalnosci modernizacji i rozbudowy Katowickiego Wezla Kolejowego. Study on the modernisation and extension of the Katowice railway junction (AP - €3,500,000)

  • Pilotażowe wdrożenie RIS Dolnej Odry. Pilot implementation of first RIS services and applications In Poland (MAP RIS - €1,600,000)

PORTUGAL

  • Estudos relativos ao desnivelamento ferroviario de Alcântara - PP8. Studies leading to the detailed design and specifications for the construction of the building of the Alcântara grade separation (AP - €1,630,052)

  • Estudos relativos ao desenvolvimento do programa de PPP do projecto de implementacao da rede ferroviaria de alta velocidade em Portugal (Projecto RAV) - PP3 e PP19. Study supporting the PPP programme for high speed rail implementation in Portugal (AP - €974,500)

  • MIELE* (MAP MoS - €7,998,250)

SLOVAKIA

  • FAB CE implementation of static area of responsibility scenario* (MAP ATM/FAB - €1,447,740)

SLOVENIA

  • Preparation of the Implementation plan for upgrading of the section of the railway line Poljcane-Pragersko (AP - €1,100,000)

  • Izdelava projekta za pridobitev gradbenega dovoljenja za avtocestni odsek Draženci-MMP Gruskovje. Study for a motorway link along the Drazenci-Gruškovje international border crossing (AP - €2,022,500)

  • FAB CE implementation of static area of responsibility scenario* (MAP ATM/FAB - €1,447,740)

  • Monitoring and Operation Services for Motorways of the Sea (MOS4MOS)* (MAP MoS - €2,825,752)

  • ITS Adriatic multi-port gateway* (MAP MoS - €1,442,500)

SPAIN

  • Muelle Prat rail terminal (AP - €2,913,499)

  • Redacion de proyectos de adecuacion en las terminals: Valencia-Fuente de San Luis-Madrid-Vicalvaro y otras actaciones. Drafting projects in railway freight terminals (AP - €2,585,000)

  • PP3 Alta velocidad Madrid-Lisboa, tramo Madrid-Oropesa: estudios (fase I) (AP - €5,000,000)

  • L.A.V. Madrid-Pais Vasco-Frontera Francesa: redaccion de proyectos constructivos. HSR Line Madrid-Basque Country-French border: drafting of construction projects (AP - €2,350,385)

  • L.A.V. Bobadilla-Granada: estudios y proyectos. HSR Bobadilla-Granada: studies and projects (AP - €2,247,711)

  • Greening European transportation infrastructure for electric vehicles* (AP - € 4,950,000)

  • MIELE* (MAP MoS - €7,998,250)

  • Monitoring and Operation Services for Motorways of the Sea (MOS4MOS)* (MAP MoS - €2,825,752)

SWEDEN

  • Completion of the Haparanda Line - an important link in the Bothnian Corridor (AP - €2,960,000)

  • North European Functional Airspace Block (NEFAB) development - preparation for implementation* (MAP ATM/FAB - €4,094,370)

  • The Baltic Sea hub and spokes project* (MAP MoS - €24,846,900)

  • MonaLisa* (MAP MoS - €11,234,003)

UNITED KINGDOM

  • Felixstowe Rail Terminal - improving intermodal transfer and removing bottleneck on PP26 (AP - €5,000,000)

  • Port Salford (enabling studies and works) (AP - €998,125)

  • Priority Axis 26: Nuneaton North Chord and Kennett re-signalling works (AP - €4,994,333)

  • UK-Ireland FAB development of high level sectors* (MAP ATM/FAB €1,154,378)

2010 Call Statistics

Source: TEN-T Executive Agency

ATM/FAB = Air Traffic Management/Functional Airspace Blocks

MoS = Motorways of the Sea

RIS = River Information Services

IWW = Inland Waterways­


Side Bar

My account

Manage your searches and email notifications


Help us improve our website